1 hour fire safe hoarding

Our Lintlock Hoarding System was used to create a 4.8 meter high by 8 meters long 1 hour fire safe hoarding system to the new Le Creuset store at the Swindon Designer Outlet. This enabled our client to safely carry out their strip out and fit out works.

In one short night we installed to completion ready for graphics to be installed.

Built in double doors did not detract from the overall effect and were built in with the full 1 hour fire rated integrity.

After another successful install job with full fire and structural sign off we wish our client luck with their works and look forward to seeing you soon for the take down!!